Oil & Gas Wellsite — Temporary Pad & Access Road

Oil & gas operator built an entire frac wellsite pad on HDPE mats — saved permanent gravel cost.

Discuss Your Project

Application

For frac operations on smaller pads (multi-well horizontal drilling), some operators use HDPE mats instead of permanent gravel. Mats let the operator complete the frac, demobilize, and restore the surface — reducing reclamation cost.

Typical Spec

Cost Model

Versus gravel pad: roughly equal initial cost, but mats can be redeployed to next location (3-5 cycles before significant wear). Reclamation cost is ~80 % lower (no gravel removal). Net cost over 5 years is ~50-60 % lower than gravel for operators with multiple pads per year.

Recommended Products for This Application

HDPE Ground Protection Mats (4×8 ft Standard)

HDPE Ground Protection Mats (4×8 ft Standard)

Heavy-duty 4×8 ft HDPE access mats — distribute crane loads, protect turf, create temporary roads.

View product →

Request a Quotation

Tell us about your ground protection mats project. Our engineering team responds within 12 hours with technical specs and FOB pricing.

Part of the JSLT Global Manufacturing Network · jslt-polymers.com jspolymers.com plasticos-ingenieria.com